Solid Power Inc. is a licensed Florida electrical contractor (license EC13008432) based in Hialeah. We upgrade and replace electrical panels from 100 to 600 amp for homes and businesses in Hialeah, Miami-Dade and Broward, and we pull the permit and coordinate the inspections. Call 305-305-3619 and we will set up a look at your panel.
These are signs that your panel may be too old, too small or worn out. You can see or notice them without opening anything:
Many older panels were not sized for a whole-house electric tankless water heater, which can need several dedicated 240-volt circuits.
Never take off the inner cover of the panel (the dead front) yourself. The service wires feeding the main stay live even when the main breaker is off. Leave the cover on and call a licensed electrician. If you see smoke or flames, get everyone out and call 911.
An electrical panel (the breaker box) takes the power coming from the meter and splits it into circuits. Each circuit is protected by a breaker. Older homes may still have fuses instead.
People use these words loosely. Here is how we use them.
An electrician has to look at the panel to tell you which one you need. For breaker-only problems, see circuit breaker repair. For the long version, read electric panel repair vs replacement.
A typical 200-amp residential panel upgrade runs about $1,800–$4,500, depending on conditions.
Here is what moves the price:
Some things only show up once an electrician has looked closely. They can change the work and the price:
Whoever is on site tells you before the scope changes, and you see it in writing.
We give you a written, itemized quote after we look at the property. Commercial panels are priced from the job itself after a site visit. For a longer breakdown, see what affects panel upgrade cost in Hialeah.
Typical timeline: the install itself often takes one working day. The power stays off until the work passes inspection and the power company reconnects, so we schedule those together. A new meter base, a long wire run or a utility visit can add time.
How to get ready for install day:



We replace and upgrade commercial panels and service equipment from 100 to 600 amp, including 3-phase. We work with tenants and property managers in Hialeah, Miami-Dade and Broward.

More on commercial electrician services in Hialeah.




A typical 200-amp residential panel upgrade runs about $1,800–$4,500, depending on conditions. The price changes with the amperage, whether the meter or service wires change, the permit, FPL coordination, wall and drywall work, grounding and bonding, and surge protection. We give a written, itemized quote after we look at the property.
Watch for breakers that trip often, a warm or buzzing panel, a burning smell, flickering lights, rust, or a Federal Pacific or Zinsco label. You may also need one if you are adding an EV charger, a tankless water heater or a new A/C. Do not take the cover off the panel. A licensed electrician should inspect it and tell you what the load needs.
An upgrade raises the size of the service, for example 100 amp to 200 amp, and often includes a new meter base and service wires. A replacement puts in a new panel at the same size because the old one is worn, damaged or out of space. An electrician has to look at your panel to say which one fits.
Yes. Panel replacement and service upgrades need a permit and an inspection from the building department that covers your property. The work falls under the Florida Building Code and the NEC. When you hire a contractor, the licensed electrical contractor pulls the permit. Solid Power Inc., license EC13008432, handles the permit and the inspection for you.
The install itself often takes one working day. Power stays off until the work passes inspection and the power company reconnects. A new meter base, a long wire run or a utility visit can add time. We tell you the plan before we start and we do not promise dates we cannot hold.
When the service changes, the power company (FPL in most of Miami-Dade and Broward) has to disconnect the service and reconnect it after the work passes inspection. Those visits have to be scheduled. We coordinate them for you. Do not touch the meter or the service wires yourself. They stay live until the utility removes the power.
Florida allows an owner to pull a permit for their own home, but we strongly advise against it. The wires feeding the panel stay live, only the power company can reconnect the service, and the work needs a permit and an inspection under the Florida Building Code. Hire a licensed electrical contractor. Solid Power Inc., license EC13008432, does the work and handles the permit.
Federal Pacific panels have widely reported breaker problems, so an electrician should look at yours. You can often see the brand on the panel door or its label. Do not take off the inner cover. If the brand is Federal Pacific, we suggest replacing it. Solid Power Inc. can confirm the brand and quote the replacement.
Many older Hialeah homes have 100 amp service. That can be enough for a small home with few big loads. A 200 amp panel gives room for an EV charger, a tankless water heater or a new A/C. An electrician sizes the service from a load calculation under NEC Article 220.
Sometimes. A panel at the same size often keeps the existing meter base. A bigger service, or a meter base that is rusted, damaged or not up to current rules, may need new equipment. If the meter or service wires change, FPL has to be scheduled. We check this at the first visit.
An electrical panel, or breaker box, takes the power coming from the meter and splits it into circuits for the lights, outlets and appliances. Each circuit is protected by a breaker that trips when the circuit is overloaded or faulted. Older homes may still have fuses instead. An electrician can tell you what your panel is and whether it is still safe to use.
Yes, in most cases. The power is off for part of the day, so charge your phones, plan your meals and keep children and pets away from the work area. We tell you the power-off window ahead of time. If you run medical equipment that needs power, tell us when you call so we can plan around it.
It depends on the load calculation for your home. Some homes have the room, and some need a larger service. Sometimes a listed EV load-management system avoids the upgrade. NEC 625.42 lets the load calculation use the limit the system enforces, and the building department has to approve it. An electrician has to run the numbers. See our Level 2 EV charger guide.
Insurers may ask about the type and age of your panel. The inspector or your insurer tells you what they need. Solid Power Inc. confirms the brand and condition of the panel, quotes the replacement and handles the permit. We cannot promise what an insurer will decide, so ask your insurer what it requires.
Usually not. Your existing circuits move into the new panel. If the electrician finds damaged or undersized wire, we quote that separately and show it in writing. Subpanels for a garage, workshop or pool equipment are separate work and are quoted on their own. Panel work does not automatically mean rewiring the whole house.
Yes. Solid Power Inc. upgrades and replaces commercial panels and service equipment from 100 to 600 amp, including 3-phase, for tenant improvements and existing buildings in Hialeah, Miami-Dade and Broward. The work is permitted and inspected. Call 305-305-3619 and tell us the building, the current panel and what you need to add.
A licensed Florida electrical contractor, working under a permit and an inspection from the city or county building department. Solid Power Inc., license EC13008432, is based in Hialeah and replaces panels from 100 to 600 amp for homes and businesses in Miami-Dade and Broward. You can look up any Florida license before you hire.
Solid Power Inc. cambia y mejora paneles eléctricos en Hialeah, Miami-Dade y Broward. Somos contratistas eléctricos con licencia de la Florida, licencia EC13008432. Trabajamos casas y negocios, desde 100 hasta 600 amperios. Un cambio de panel de 200 amperios en una casa normalmente cuesta entre $1,800 y $4,500, según las condiciones. Sacamos el permiso con el departamento de construcción y coordinamos la inspección. Cuando cambia el servicio, coordinamos con FPL el corte y la reconexión. FPL reconecta la luz después de que la inspección aprueba el trabajo. Nunca quite la tapa interior del panel usted mismo; llame a un electricista con licencia. Llámenos al 305-305-3619, de lunes a viernes, de 7:00 AM a 3:30 PM. Trabajos fuera de horario solo con cita.
Un cambio de panel de 200 amperios en una casa normalmente cuesta entre $1,800 y $4,500, según las condiciones. El precio depende de los amperios, si cambia el medidor o los cables de entrada, el permiso, FPL, la pared, la tierra del sistema y la protección contra sobrevoltaje. Le damos un presupuesto por escrito después de ver la propiedad.
Fíjese si los breakers se botan seguido, si la tapa del panel está caliente, si huele a quemado o si las luces parpadean. También si el panel dice Federal Pacific o Zinsco, o si va a poner un cargador de carro eléctrico. No quite la tapa del panel. Un electricista con licencia debe revisarlo y decirle qué necesita.
Sí. El cambio de panel y la mejora del servicio necesitan permiso e inspección del departamento de construcción de su ciudad o condado. El trabajo sigue el Código de Construcción de la Florida y el NEC. Solid Power Inc., licencia EC13008432, saca el permiso y coordina la inspección.
Tell us what the panel looks like, what you want to add, and the address of the property when you call. We will set up a time to look at it.
Related: Hialeah electrical services | residential electrician | Do I need a permit to upgrade my electrical panel? | grounding | Miami-Dade County | Broward County | contact us